메뉴 건너뛰기

?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄 수정 삭제
?

단축키

Prev이전 문서

Next다음 문서

크게 작게 위로 아래로 댓글로 가기 인쇄 수정 삭제

How to Calculate EAC in Project Management: A Step-by-Step Guide

Project management is a complex process that involves managing resources, timelines, and budgets to ensure successful project completion. One of the most critical metrics in project management is the Estimate at Completion (EAC), which represents the expected total cost of a project at its completion. Calculating EAC is essential for project managers to accurately forecast project costs and budgets, and to ensure that projects are delivered within budget.



Calculating EAC involves using formulas and scenarios to predict the total cost of a project once it is finished. There are several approaches to calculating EAC, including the EAC based on the budget at completion, the EAC based on the actual cost incurred, and the EAC based on the earned value management method. Project managers must understand these approaches and choose the most appropriate one based on the project's specific requirements and constraints. By accurately calculating EAC, project managers can make informed decisions and take corrective actions to ensure that projects are completed within budget and on time.

Understanding EAC in Project Management



Estimate at Completion (EAC) is a vital tool in project management. It helps project managers predict the final cost of a project based on its current performance. By calculating EAC, project managers can determine whether a project is on track to meet its budget or if it is overrunning its budget.


EAC is calculated by taking the actual cost of the project to date and adding the estimated cost of the remaining work. There are several methods to calculate EAC, including the use of performance indices, such as the Cost Performance Index (CPI) and Schedule Performance Index (SPI).


One of the most common methods to calculate EAC is the use of the CPI. The CPI is a ratio of the earned value (EV) to the actual cost (AC) of the project. By dividing EV by AC, project managers can determine the efficiency of the project's cost performance. If the result is greater than one, the project is under budget, and if it is less than one, the project is over budget.


Once the CPI is determined, project managers can use it to calculate the EAC. The formula for calculating EAC using CPI is EAC = AC + (BAC - EV) / CPI. In this formula, BAC represents the budget at completion, and EV represents the earned value of the project to date.


Another method to calculate EAC is the use of the To-Complete Performance Index (TCPI). The TCPI is a ratio of the remaining work to the remaining budget. By dividing the remaining work by the remaining budget, project managers can determine the efficiency needed to complete the project within budget. If the result is greater than one, the project is unlikely to meet its budget, and if it is less than one, the project is likely to meet its budget.


In conclusion, EAC is a critical tool in project management, helping project managers predict the final cost of a project based on its current performance. By using EAC, project managers can determine whether a project is on track to meet its budget or if it is overrunning its budget. There are several methods to calculate EAC, including the use of performance indices, such as the CPI and TCPI.

Calculating EAC: Basic Formula



EAC = BAC / CPI


One of the most commonly used formulas for calculating EAC in project management is EAC = BAC / CPI. This formula is used to calculate the Estimate at Completion (EAC) for a project, which is the expected total cost of the project when it is completed.


The EAC formula takes into account the actual cost of the project to date, as well as the expected cost of the remaining work. The formula uses two key metrics: the Budget at Completion (BAC) and the Cost Performance Index (CPI).


Understanding BAC


The Budget at Completion (BAC) is the total budgeted cost for the entire project. It represents the total amount of money that the project is expected to cost when it is completed. The BAC is usually determined during the planning phase of the project and is based on the project scope, schedule, and resource requirements.


Understanding CPI


The Cost Performance Index (CPI) is a measure of how efficiently the project is using its budget. It is calculated by dividing the Earned Value (EV) by the Actual Cost (AC). The Earned Value is the value of the work that has been completed to date, while the Actual Cost is the actual cost of the work that has been completed to date.


If the CPI is greater than 1, it means that the project is under budget, while a CPI of less than 1 indicates that the project is over budget. A CPI of 1 means that the project is on budget.


By using the EAC = BAC / CPI formula, project managers can get a better understanding of the expected total cost of the project when it is completed. This formula is particularly useful when there have been changes to the project scope or schedule, or when the project is not performing as expected.

EAC Forecasting Methods



There are several methods to forecast the Estimate at Completion (EAC) in project management. The EAC is the estimated cost of the project at completion. Below are the most common EAC forecasting methods.


EAC with No Variances


This method is used when the project is progressing as planned with no variances. The formula for this method is:


EAC = BAC / CPI


Where BAC is the Budget at Completion, and CPI is the Cost Performance Index. The CPI is calculated as the ratio of Earned Value (EV) to Actual Cost (AC).


EAC with Current Variances


This method is used when there are variances in the project, but the project team expects the variances to continue in the future. The formula for this method is:


EAC = AC + ETC


Where AC is the Actual Cost, and ETC is the Estimate to Complete. The ETC is calculated as the difference between the Budget at Completion (BAC) and the Earned Value (EV), divided by the Cost Performance Index (CPI).


EAC with Atypical Variances


This method is used when there are atypical variances in the project that are not expected to continue in the future. The formula for this method is:


EAC = AC + [(BAC - EV) / (CPI x SPI)]


Where AC is the Actual Cost, BAC is the Budget at Completion, EV is the Earned Value, CPI is the Cost Performance Index, and SPI is the Schedule Performance Index.


EAC with Typical Variances


This method is used when there are typical variances in the project that are expected to continue in the future. The formula for this method is:


EAC = BAC / (CPI x SPI)


Where BAC is the Budget at Completion, CPI is the Cost Performance Index, and SPI is the Schedule Performance Index.


By using one of these EAC forecasting methods, project managers can estimate the cost of the project at completion, which is essential for effective project budgeting and cost control.

Determining Which EAC Formula to Use



There are different EAC formulas available in project management, and choosing the right one depends on the situation. The following paragraphs describe the different scenarios in which each formula is applicable.


Scenario 1: When the original budget is still valid


If the project is expected to continue as planned, and the original budget is still valid, the EAC formula to use is EAC = BAC / CPI. Here, BAC stands for Budget at Completion, and CPI stands for Cost Performance Index. The CPI is calculated as EV / AC, where EV is the Earned Value, and AC is the Actual Cost.


Scenario 2: When the original budget is no longer valid


If the project is not expected to continue as planned, and the original budget is no longer valid, the EAC formula to use is EAC = AC + Bottom-up ETC. Here, AC stands for Actual Cost, and ETC stands for Estimate to Complete. The Bottom-up ETC is calculated by estimating the cost of each remaining task and summing them up.


Scenario 3: When the project has experienced significant changes


If the project has experienced significant changes, such as scope changes or delays, the EAC formula to use is EAC = AC + Revised ETC. Here, AC stands for Actual Cost, and Revised ETC is the estimated cost to complete the remaining work, taking into account the changes that have occurred.


Scenario 4: When the project is expected to be completed ahead of schedule


If the project is expected to be completed ahead of schedule, the EAC formula to use is EAC = AC + (BAC - EV) / (SPI * CPI). Here, AC stands for Actual Cost, BAC stands for Budget at Completion, EV stands for Earned Value, discuss, mouse click the up coming article, SPI stands for Schedule Performance Index, and CPI stands for Cost Performance Index.


Scenario 5: When the project is expected to take longer than planned


If the project is expected to take longer than planned, the EAC formula to use is EAC = AC + [(BAC - EV) / (SPI * CPI)]. Here, AC stands for Actual Cost, BAC stands for Budget at Completion, EV stands for Earned Value, SPI stands for Schedule Performance Index, and CPI stands for Cost Performance Index.


In summary, choosing the right EAC formula depends on the situation. By understanding the different scenarios and formulas, project managers can accurately forecast the cost of completing a project.

Applying EAC to Project Performance



Analyzing Cost Performance


Once the EAC has been calculated, project managers can use this information to analyze the cost performance of the project. By comparing the EAC to the original budget, project managers can determine whether the project is over or under budget. This information can be used to identify areas where cost savings can be made and to adjust the project budget accordingly.


In addition, project managers can use the EAC to calculate the Cost Performance Index (CPI) and the To-Complete Performance Index (TCPI). The CPI is a measure of how efficiently the project is using its resources, while the TCPI is a measure of how efficiently the project needs to use its resources in order to meet its budget targets. By analyzing these indices, project managers can identify areas where the project is performing well and areas where improvements need to be made.


Revising Project Budget


One of the most important applications of the EAC is in revising the project budget. If the EAC indicates that the project is over budget, project managers can use this information to revise the budget and identify areas where cost savings can be made. For example, if the EAC indicates that the project is over budget due to unexpected costs, project managers can work to identify the cause of these costs and take steps to prevent them from occurring in the future.


On the other hand, if the EAC indicates that the project is under budget, project managers can use this information to identify areas where additional resources can be allocated. For example, if the EAC indicates that the project is under budget due to efficient resource usage, project managers can allocate additional resources to other areas of the project in order to improve performance.


In conclusion, the EAC is a valuable tool for project managers to analyze cost performance and revise project budgets. By using this information effectively, project managers can ensure that their projects are completed on time and within budget.

EAC and Risk Management


Identifying Risks


Risk management is an essential component of project management. Identifying risks is the first step in managing them. Project managers must have a comprehensive understanding of the potential risks that could impact their project. They should also have a plan in place to mitigate these risks.


One way to identify risks is to conduct a risk assessment. This involves analyzing the project plan and identifying potential risks. Risk assessment should be an ongoing process throughout the project lifecycle.


Incorporating Risk in EAC


Risk management also plays a crucial role in calculating EAC. Project managers should incorporate risk into their EAC calculations to get a more accurate estimate of the project's total cost.


One way to incorporate risk into EAC is to use the formula EAC = AC + (BAC - EV) / (CPI * SPI). This formula takes into account the project's actual costs (AC), budget at completion (BAC), earned value (EV), cost performance index (CPI), and schedule performance index (SPI).


Another way to incorporate risk into EAC is to use a Monte Carlo simulation. This involves running multiple simulations to determine the most likely outcome. Monte Carlo simulations take into account the project's risks and uncertainties, providing a more accurate estimate of EAC.


Incorporating risk into EAC is essential for effective project management. It helps project managers make informed decisions and ensures that the project stays on track.

Integrating EAC with Earned Value Management


Earned Value Management (EVM) is a project management technique that integrates the measurement of project scope, schedule, and cost. EVM provides a set of metrics to track project performance and forecast future performance. One of the key metrics in EVM is the Estimate at Completion (EAC), which is used to forecast the final cost of a project based on current performance and known factors.


To integrate EAC with EVM, a project manager needs to calculate the EAC using one of the available formulas. The most common formula for EAC is the EAC = AC + [(BAC - EV) / CPI]. In this formula, AC is the actual cost of the work completed to date, BAC is the budget at completion, EV is the earned value of the work completed to date, and CPI is the cost performance index.


Once the EAC is calculated, the project manager can compare it to the budget at completion to determine if the project is over or under budget. If the EAC is higher than the BAC, the project is over budget, and if the EAC is lower than the BAC, the project is under budget.


The EAC can also be used to forecast the final cost of the project. By comparing the EAC to the actual cost of the project to date, the project manager can determine if the project is likely to be completed within budget.


In addition to calculating the EAC, the project manager should also use other EVM metrics, such as the Schedule Performance Index (SPI) and the Cost Performance Index (CPI), to track project performance. The SPI measures the progress of the project schedule, while the CPI measures the efficiency of the project cost.


By integrating EAC with EVM, a project manager can gain a better understanding of the project's performance and forecast its future performance. This can help the project manager make informed decisions and take corrective actions to keep the project on track.

EAC Best Practices


Regular EAC Updates


Regularly updating the Estimate at Completion (EAC) is crucial for project managers to keep track of project costs and ensure that the project remains within budget. It is recommended to update the EAC at least once a month or when there is a significant change in project scope, schedule, or budget.


To calculate the EAC, project managers can use different formulas, such as the EAC based on the Budget at Completion (BAC) and the EAC based on the To-Complete Performance Index (TCPI). However, it is important to choose the most appropriate formula based on the project's unique characteristics and to ensure that the data used to calculate the EAC is accurate and up-to-date.


Stakeholder Communication


Effective communication with stakeholders is essential to ensure that the EAC is understood and accepted by all parties involved in the project. Project managers should provide regular updates on the EAC, including the assumptions and data used to calculate it.


Project managers should also communicate any risks or issues that may impact the EAC and work with stakeholders to develop mitigation strategies. This includes identifying potential cost overruns, delays, or changes in scope that may impact the EAC.


In addition, project managers should ensure that stakeholders are aware of any changes to the EAC and the impact these changes may have on the project timeline, budget, and scope. This helps to ensure that stakeholders have a clear understanding of the project's status and can make informed decisions about the project's future.


Overall, regularly updating the EAC and communicating effectively with stakeholders are critical best practices for project managers to ensure that the project remains within budget and meets stakeholders' expectations.

Case Studies: EAC in Action


Case Study 1: Cost Overrun


In this case, a project is facing a cost overrun while it is behind schedule. The project manager must use EAC to estimate the total cost of the project once it is completed. To calculate EAC, the project manager needs to use the following formula:


EAC = AC + (BAC - EV) / (CPI * SPI)


Where AC is the actual cost of the work completed, BAC is the budget at completion, EV is the earned value, CPI is the cost performance index, and SPI is the schedule performance index.


Using the formula, the project manager calculates the EAC to be $150,000. This means that the total cost of the project is estimated to be $150,000 once it is completed. The project manager can use this information to make informed decisions about the project and take corrective actions to bring the project back on track.


Case Study 2: Ahead of Schedule


In this case, a project is ahead of schedule with at less incurred cost than expected. The project manager must use EAC to estimate the total cost of the project once it is completed. To calculate EAC, the project manager needs to use the following formula:


EAC = AC + (BAC - EV) / (CPI * SPI)


Where AC is the actual cost of the work completed, BAC is the budget at completion, EV is the earned value, CPI is the cost performance index, and SPI is the schedule performance index.


Using the formula, the project manager calculates the EAC to be $120,000. This means that the total cost of the project is estimated to be $120,000 once it is completed. The project manager can use this information to make informed decisions about the project and allocate the remaining budget accordingly.


Case Study 3: Fixed Price Contract


In this case, a project is being executed under a fixed price contract. The project manager must use EAC to estimate the total cost of the project once it is completed. To calculate EAC, the project manager needs to use the following formula:


EAC = AC + (BAC - EV) / CPI


Where AC is the actual cost of the work completed, BAC is the budget at completion, EV is the earned value, and CPI is the cost performance index.


Using the formula, the project manager calculates the EAC to be $100,000. This means that the total cost of the project is estimated to be $100,000 once it is completed. The project manager can use this information to make informed decisions about the project and ensure that the project is completed within the fixed price contract.

Conclusion


Calculating the Estimate at Completion (EAC) is a critical task in project management, as it helps project managers forecast the total expected costs required to complete a project. By using the right formula and indicators, project managers can make informed decisions and adjust their budgets accordingly.


In this article, we have discussed the most common formulas used to calculate the EAC, including the EAC = AC + BAC - EV, EAC = AC + (BAC - EV) / CPI, and EAC = AC + [(BAC - EV) / (CPI * SPI)] formulas. We have also explained the meaning of the Cost Performance Index (CPI) and the Schedule Performance Index (SPI), which are key indicators used to calculate the EAC.


It is important to note that the accuracy of the EAC calculation depends on the accuracy of the data used to calculate it. Therefore, project managers should ensure that they have accurate and up-to-date data before calculating the EAC. They should also consider the assumptions and limitations of the formulas used and adjust them accordingly.


In summary, calculating the EAC is a crucial task in project management, and project managers should use the right formulas and indicators to make informed decisions. By following the guidelines outlined in this article, project managers can calculate the EAC accurately and effectively manage their project budgets.

Frequently Asked Questions


What are the steps to compute Estimate at Completion (EAC) in project management?


To compute EAC, one needs to follow these steps:



  1. Calculate the Cost Performance Index (CPI) and Schedule Performance Index (SPI) of the project.

  2. Determine the Estimate to Complete (ETC) for the remaining work.

  3. Add the ETC to the Actual Cost (AC) of the project to get the Estimate at Completion (EAC).


How do you derive the Budget at Completion (BAC) to calculate EAC?


The Budget at Completion (BAC) is the total budgeted cost of the project. It is usually determined during the planning phase of the project. To calculate EAC, one needs to divide the BAC by the Cost Performance Index (CPI).


What is the process for calculating Estimate to Complete (ETC) in project management?


To calculate ETC, one needs to follow these steps:



  1. Determine the remaining work to be done.

  2. Estimate the cost of the remaining work.

  3. Add the estimated cost of the remaining work to the Actual Cost (AC) of the project.

  4. Subtract the Total Cost (TC) of the project from the sum obtained in step 3.


Can you explain the bottom-up approach to determining EAC?


The bottom-up approach to determining EAC involves breaking down the project into smaller components and estimating the cost of each component. The estimated costs of the components are then added up to get the total estimated cost of the project. This approach is more accurate than other methods but can be time-consuming.


How does one utilize project performance data to forecast EAC?


To forecast EAC using project performance data, one needs to calculate the Cost Performance Index (CPI) and Schedule Performance Index (SPI) of the project. These indices are then used to estimate the remaining work and calculate the Estimate to Complete (ETC) and Estimate at Completion (EAC).


What are the different methods for calculating EAC based on project progress?


There are four methods for calculating EAC based on project progress:

Average-Mortgage-Payment-by-Year-768x448

  1. Simple EAC formula: EAC = BAC/CPI

  2. EAC formula with ETC: EAC = AC + ETC

  3. EAC formula with EAC projection: EAC = AC + [(BAC - EV) / (CPI * SPI)]

  4. EAC formula with EAC projection and ETC: EAC = AC + [(BAC - EV) / (CPI * SPI)] + ETC


These methods use different variables to estimate the EAC and are chosen based on the accuracy desired and the availability of data.


List of Articles
번호 제목 글쓴이 날짜 조회 수
54127 10 Sites To Help You Become An Expert In Triangle Billiards AngleaDehaven48 2024.11.14 0
54126 How To Calculate BC Ratio: A Simple Guide For Accurate Results LouellaBrickhouse 2024.11.14 0
54125 Understanding Bongacams.com AvisFqs571794237 2024.11.14 20
54124 How To Calculate Sales Tax On A Calculator: A Step-by-Step Guide Merry81031261105 2024.11.14 0
54123 How To Calculate MPS: A Clear And Simple Guide GenesisCunniff075 2024.11.14 0
54122 How To Calculate DPI: A Clear Guide EugeniaCoronado70 2024.11.14 0
54121 When To Have Intercourse To Conceive Calculator: A Guide To Optimizing Fertility RositaBradford0915 2024.11.14 0
54120 How To Calculate A Trend: A Clear And Confident Guide DaleneRummel88092 2024.11.14 0
54119 How To Calculate Percentages Using A Calculator: A Simple Guide LouellaDoyne1127263 2024.11.14 0
54118 How To Calculate 13th Month: A Simple Guide Kristal66U02971328 2024.11.14 0
54117 How To Calculate PPI: A Clear And Simple Guide TamieBartlett131377 2024.11.14 0
54116 How To Calculate A Square Yard: A Clear And Simple Guide LavondaWeidner008 2024.11.14 0
54115 Wdrożenie Bramki Płatności IDEAL W Sklepie Internetowym W Holandii – Praktyczny Przewodnik SuzetteMackrell36 2024.11.14 0
54114 How Do You Calculate Per Capita: A Clear Guide RicoBanfield89789361 2024.11.14 0
54113 How To Calculate Percentage Of An Amount: A Clear And Confident Guide HannaFortier6657077 2024.11.14 0
54112 How Do You Calculate Stairs: A Step-by-Step Guide TressaSeyler354897677 2024.11.14 0
54111 How To Calculate The Area Of A Rectangle: A Clear And Simple Guide EmelyGrabowski41 2024.11.14 0
54110 How To Calculate Age Of Gestation: A Clear And Confident Guide RosellaCade8081 2024.11.14 0
54109 How To Calculate Density: A Simple Guide For Beginners Neville67L643787 2024.11.14 0
54108 How To Calculate Selling Price Using Markup Percentage: A Clear And Confident Guide ShelliParent3080 2024.11.14 0
Board Pagination Prev 1 ... 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 ... 3817 Next
/ 3817

BANKING ACCOUNT

예금주: 한빛사무기(반재현)

신한은행 100-031-495955

CUSTOMER CENTER

고객센터: 1688-5386

고객센터: 010-5485-8060

팩스: 043-277-7130

이메일: seoknamkang@gmail.com

업무시간: 평일 08-18시. 토, 공휴일휴무

주소: 청주시 흥덕구 복대로 102 세원아파트상가 2층 (복대동 세원아프트 단지내 슈퍼 옆)

대표: 강석남

사업자등록번호: 301-31-50538

통신판매업 신고번호: 012-12345-123

© k2s0o1d4e0s2i1g5n. All Rights Reserved